Smart Trac UG2 global launch: an AI workflow from storyboard to final animation
Launch film for Tractian's newest and most powerful sensor, in US, Mexico and Brazil versions, each hosted by a different CEO. I co-led the project, was art director of the shoot (two shoot days plus a pre-light day), and designed the AI workflows that planned the shoot and produced the CGI transitions.
Also published: Mexico version · Brazil version
01Context
Tractian launched the Smart Trac UG2, its newest and most powerful sensor, with a global film on a very tight timeline.
The shoot used real software screens on set instead of green screens, so it depended on the product team, and on the copywriting team for the final scripts.
02Audience and goal
Three markets, three versions: the US, Mexico and Brazil, each hosted by a different company CEO. The goal was one film that spoke to each market and shipped on schedule.
03Approach
- Pre-production and direction
- I co-led the project and owned the technical and visual direction: the art elements on set, the overall look and the cinematography. I was the main link to the partner production company.
- Art direction on set
- I was art director of the shoot, two shoot days plus a pre-light day, across three versions, one for each CEO and market.
- A planning workflow for the shoot
- The planning ran in Magnific Spaces, a node-based AI platform. From the floorplan and reference photos of Tractian's lab, the workflow produced overhead views of the space and the storyboard, so we could plan where everything would be before the team arrived.
- A workflow for the CGI transitions
- Each version has three CGI transitions, such as the sensor leaving the CEO's hand and becoming a 3D animation. I designed the workflow that made them: node-based, combining animation, prompting and generative AI, from generating the CGI to integrating it with the footage.
- One edit as the template
- I edited the US version first to lock the pacing, music and motion graphics style. It became the template for the Mexico and Brazil versions.
- Color across two shooting days
- Different environments and lighting meant the three videos did not match. I graded all three to match.
04Result
The film was delivered on schedule in all three versions and approved quickly by company leaders and the CEOs.
Each of the three versions has three CGI transitions made with the workflow. By hand they would not have fit the schedule.
The CGI transitions and the planning canvases








Tools
- After Effects
- Premiere Pro
- DaVinci Resolve
- Blender
- Figma
- ElevenLabs
- Magnific Spaces
Next case